May 2011
4 posts
April 2011
14 posts
Front panel replaced, Fresh air box replaced, Cab floor repaired, Inner front panel replaced, A pillars repaired, NOS front steps fitted, New seatbelt mounts fitted, Doors repaired, Lower B pillars repaired, Bulkheads repaired, Cargo floor repaired, Inner sills, Mid sills, Outer sills, Side loading door bottom replaced, Rear 1/4’s replaced, Rear corner replaced, Tailgate replaced, Engine lid replaced, Some out riggers replaced, Inner front valence replaced, Jacking points replaced, Front chassis repaired.
Still to do! Other rear corner, Both battery trays, Rear valence, Rear half of roof, Sliding channels under rear windows, Track cover V sections, Front beam repair and lower, Lower rear, Fill, prep and paint, Rebuild engine, Prep and paint pop top, Fit rock n roll bed, Build interior, MOT, Retrim, Start putting it back together with all the new bits that fill the spare room at the moment! Look forward to many years of enjoyment!